Remove Insurance Remove Off-The-Shelf Remove Technical Leadership
article thumbnail

Navy Acquisition Can Easily Be Fixed

Marv's Smart Future

Long acquisition programs also insure that nobody in the acquisition system is personally responsible for failure because a Program Manager’s (PM) 3-4-year leadership tour only covers a portion of the full requirement-to-IOC (Initial Operational Capability) timeline. naval warfare.

article thumbnail

Meta-methodology

The Programmer's Paradox

To be complete, a methodology should cover every step of the process from gathering all necessary information about the problem to deploying and operating the solution in a production environment. A methodology is so necessary that a bad one is often better than nothing. A constantly shifting landscape is not a suitable foundation for building on.