Remove 2005 Remove Continuous Integration Remove Minimum Viable Product
article thumbnail

The Best Product Engineering Org in the World

James Shore

They also love test-driven development, pairing, continuous integration, and evolutionary design. In 2005, it was officially cancelled, and the director of the FBI appeared before a Senate subcommittee to explain how the FBI had managed to waste $104.5 This loop is where the idea of Minimum Viable Product comes from.